Wednesday 14 November 2012

Plant Load Factor (PLF) of a Power Plant


PLF = Actual Output / Maximum Output

Suppose a power plant (1000 MW) generated 4200000 MWH annually 

then PLF = 4200000 / (365 days) x (24 Hr/day) x (1000 MW)

                = 0.479 = 47.9%

No comments:

Post a Comment