Showing posts with label Plant Load Factor. Show all posts
Showing posts with label Plant Load Factor. Show all posts
Wednesday, 14 November 2012
Plant Load Factor (PLF) of a Power Plant
PLF = Actual Output / Maximum Output Suppose a power plant (1000 MW) generated 4200000 MWH annually then PLF = 4200000 / (365 days) x (24 Hr/day) x (1000 MW) = 0.479 = 47.9%